TOP 202MW Small Power Producer PJT Building Package
Contract Amount : 130.0 Mil THB   

  • Substation 80
  • Substation 81
  • GTG Control BLDG 2EA
  • STG Control BLDG 2EA
  • Work Period : Sep. ‘14 ~ Jul. ‘15

      Major Work Volume :

  • lPile Cutting : 471 ea
  • lExcavation : 1,014.00 m3
  • lBack Fill : 537.00 m3
  • lRebar : 375.04 Tons
  • lForm Work : 19,050.50 m2
  • lConcrete Work : 2,181.00 m3
  • lDemolition Work : 175.09 m3
  • lMasonry Work : 4,288.50 m2